asset recovery, rigging team with sling and interior demolition

Clean Projects Keep an Eye on the Environment

Clean Projects Keep an Eye on the Environment

Whenever a manufacturing plant, processing facility, building, refinery, or industrial plant undergoes demolition, dismantling, decommissioning, or relocation, there will invariably be hazardous chemicals, substances and materials to contend with, as well as recyclable and/or salvageable materials.  These materials and contaminants must be identified early on and method of disposal, remediation, decontamination, and recovery must be meticulously planned. 

During the planning stage, R. Baker & Son works closely with client, EHS personnel in particular, to determine what substances and materials may be encountered, and where.  A thorough site assessment follows to specifically test and identify all chemicals, fluids, and materials.  Aged facilities can hold unexpected surprises in old, abandoned pipes and tanks.  Once all contaminants are identified, a remediation plan is developed that encompasses scheduling, regulatory reporting, abatement, remediation, and disposal. 
Refrigerants, hydraulic fluids, and glycols must be reclaimed from equipment and mechanical systems. Fluids must be safely recovered from tanks, columns, vessels, and pipelines before they can be flushed, decontaminated or removed.  HVAC and other ducts may contain accumulated debris that must be properly removed.  Asbestos requires careful abatement as do lead-painted surfaces and fixtures, and PCBs may also be present.  If equipment and machinery are being relocated to a different facility, DOT regulations require that certain fluids be removed prior to transport. 

Demolition debris that can be recycled must be sorted either onsite, or sent to an offsite sorting facility. Recyclable materials can include metal, brick, concrete, cardboard, plastic, wood, glass, gypsum carpet, and insulation.  Old ballasts and fluorescent lighting must be recovered and properly handled.  R. Baker & Son is 100% LEED complaint, and ensures that clients will receive all available points on projects that qualify. 

About R. Baker & Son All Industrial Services


R. Baker & Son All Industrial Services, a Service-Disabled Veteran-Owned Small Business (SDVOSB) in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

Demolition, wrecking and razing, rigging, millwright, plant reconfigurations, heavy rigging, Service-Disabled Veteran-Owned Small Business / SDVOSB, salvage, dismantling, decommissioning, plant and machinery moving, building demolition, riggers, environmental services, remediation, decontamination, abatement, interior demolition, investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook: https://www.facebook.com/Demolition.Rigging

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...