Safe Conditions - The Demolition Environment

proper lighting and ventilation throughout a demolition project

Having the proper lighting and ventilation throughout a demolition project is important to ensure safe conditions for workers and site personnel. Though often overlooked by other demolition contractors, R. Baker & Son develops and implements lighting and ventilation plans on every project we do.

Low lighting levels can a pose a significant hazard on a demolition project and can be directly connect with increased injury. Years ago, worksite lighting typically consisted of 100W incandescent lightbulbs spaced forty to fifty feet apart on stringers, and bulbs that burned out often went unchanged. Nowadays, a demolition contractor should provide sufficient lighting with high-output mercury vapor, LED, or quartz lighting with protective cages. Lighting should be at least 3W per square foot, though some areas may require more. Shafts, pits, and other dark pockets require their own lighting, rather than depending on general area lighting to illuminate them. Demolition lighting requires constant vigilance in that lighting and lighting circuits must be relocated as work progresses to keep lighting levels sufficient and fixtures in good working order for the duration of the project.

Dirt, dust, and other particulates are an inherent part of every demolition project. Ventilation can be handled either by using the existing HVAC system, or by bringing in temporary ventilation in the form of sufficiently-sized exhaust fans. Like lighting, ventilation requires constant attention to ensure that filters are clean and equipment is running and performing properly. There should be several air changes per hour at minimum, which can be determined easily by calculating the total volume of the space, but more may be required depending on the task at hand. In demolition areas adjacent to clean spaces, a flow indicator or magnehelic gauge should be used to ensure that dust does not escape.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Demolition Equipment in the field, R. Baker & Son
Sustainable Demolition Services: R Baker's Lean Meets Green Approach

Over our 90 years in business, R. Baker & Son has witnessed tremendous changes and progress in the demolition industry. Today's demolition work presents unique challenges and opportunities...
Warehousing and industrial rigging services for plant relocation.
Plant Relocation Services: Planning & Production | R. Baker & Son

The decision to relocate a manufacturing facility represents one of the most significant undertakings a company can face. Success hinges on expert project management, strategic planning, and seamless...
Rigging equipment ready for a heavy lift, NYC, NJ
Industrial Rigging NYC & NJ: Choosing Your Urban Partner

New York City and New Jersey's iconic skylines? They're pure proof of incredible construction and engineering. But peel back the layers of every towering building and complex industrial spot,...
Heavy equipment rigging during the installation of a new grain silo and processing system by R Baker.
Grain Silo & Equip. Installation: R Baker

R. Baker recently completed a challenging and uniquegrain processing installation, involving theheavy equipment riggingandindustrial equipment installationof four 70-foot processgrain silos, an...
Specialized healthcare demolition ensuring sterile environments with ICRA compliance.
Healthcare Demolition: ICRA Protocol & Clean Environments

Healthcare facilities present some of the most challenging environments for interior and selective demolition projects, where maintaining a sterile, contamination-free environment is absolutely...
lean construction meeting for Rigging NYC, NJ
Lean Construction: Optimize Demolition, Rigging & Dismantling Projects

Many R. Baker clients have adopted and use the lean construction process on their projects, the list includes most pharmaceutical companies, energy companies, manufacturing of all kinds along with...
Secure storage of industrial boiler for rigging and assembly projects in New York and New Jersey.
Rigging Services for NYC and NJ: Offsite Storage & Asset Management

For rigging projects in New York City and New Jersey, access to secure offsite storage and asset management is a crucial component of rigging, setting, and assembly operations,helping accommodate...
Safe rigging procedures and equipment inspection - R. Baker & Son
Rigging: A Complete Guide to Safety, Equipment, and OSHA Standards

Rigging is one of the most critical operations in heavy industry, and at R. Baker & Son, we specialize in safe, compliant lifting with the right equipment, planning, and OSHA-certified practices....