asset recovery, rigging team with sling and interior demolition

Rigging and Assembly in New Storage and Maintenance Facility

Rigging and Assembly in New Storage and Maintenance Facility

A longtime customer referred R. Baker & Son to a company in need of immediate assistance at their company’s new storage facility. Truckloads of various materials and equipment were arriving daily, and the industrial racking systems needed to accommodate them had been delayed by months and only just arrived. Perimeter walls and most of the floors of the 20,000-square-foot area were stacked with pumps, hoses, IBC bins, portable equipment, valves, and various other materials, severely hampering day-to-day operations. The Baker team was tasked with installing the racking as soon as possible. 

R. Baker & Son worked with the client to lay out the racking on shop drawings, followed by a 3D model, before we got to work assembling and installing over 1,000 linear feet of racking. Individual racks sections measuring 10 ft. high, 4 ft. deep, and 20 ft. in length would be stacked two high for a total height of 20 feet. The racking system was rated to support up to 4,000 lbs., a necessity for storing large pumps and motors weighing as much as 1,500 lbs. A site-specific safety plan was developed and daily toolbox talks were conducted in coordination with the client’s safety manager. 

We had four teams working on the project, two assembling the racking systems and two installing and anchoring them. Upper racking levels were placed using two forklifts, assisted by an articulating boom and scissor lift, and tied into the building’s steel beams to prevent any movement. Bottom racks were securely anchored to the floors. Ten bollards were installed in specific areas to prevent forklifts from damaging the new racking systems.

Before we finished the installation project, the client asked for our assistance loading the miscellaneous equipment and materials on the new racks and we were happy to oblige. We also assisted with the installation of new lighting in all of the aisleways, brought in a large new shop air compressor, and installed new prefabricated maintenance tables. 

Working hand-in-hand with the client, the entire project took just over two weeks to complete. They were relieved to have finally solved a problem they’d had for nearly a year and have a functioning warehouse and maintenance area with manageable inventory control.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Precision Chiller Dismantling & Mechanical Retrofit Case Study
Precision Chiller Dismantling & Mechanical Retrofit Case Study

A local New Jersey representative for a major chiller manufacturer recommended R. Baker & Son for a demanding chiller change-out project. The scope: remove two 1,200-ton chillers and their...
Discover how a custom negative pressure wall and real-time monitoring protected a pharmaceutical cleanroom during high-stakes facility demolition.
How to Protect Active Cleanrooms During Demolition: A Negative Pressure Wall Case Study

Protecting a client's environment during demolition and renovation work has always been part of what we do at R. Baker & Son. Anyone in the industry knows ICRA protection, the barrier system...
rigging medical equipment into a hospital - R. Baker & Son
Just-in-Time Rigging Keeps a Hospital Running During a Critical Enabling Project

R. Baker & Son received a call from a concerned South Jersey mechanical contractor facing a complex rigging project on a tight deadline. Another rigging contractor had passed on the job late in...
Riggers assembling tower crane sections during construction - R. Baker & Son - Master Riggers.
How Mobile and Tower Cranes Are Assembled & Dismantled

Mobile cranes come in many styles, shapes, and sizes, with the hydraulic crane and the luffing jib being the most common. R. Baker & Son has worked with just about every mobile crane on the...
Demolition concrete debris fed into an industrial crusher for recycling
7 Ways Demolition Protects Communities & the Planet

7 Ways Demolition Builds Better Communities -And Why It Matters When most people picture demolition, they see dust clouds and falling walls. What they don't see is the careful planning,...
R. Baker & Son industrial contractors executing mission-critical transformer replacement with rigging equipment at medical facility
How R. Baker & Son Executes High-Stakes Projects with Engineered Work Plans

Mission-critical and high-stakes projects demand detailed, preplanned coordination to ensure success at every level. When it comes to plant shutdowns, startups, repairs, changeovers, and equipment...
R. Baker & Son rigging team performing final precision positioning and alignment of a multi-ton medical MRI magnet onto its concrete anchoring pad inside a specialized hospital imaging room.
MRI & Medical Imaging Equipment Rigging: A Turnkey Installation Case Study

Medical equipment rigging and installation requires a specialized approach to protect high-value, delicate assets. At R. Baker, we successfully navigate these complex rigging projects using...
R. Baker and son welding on complex hospital demolition job
Hospital Boiler Room Demolition: Removing Steam Boilers and Mechanical Equipment

R. Baker & Son was tasked with a complex demolition project at an active hospital, systematically removing two aging Cleaver-Brooks steam boilers (a 350 HP and a 200 HP unit), along with an...