Rigging Near Overhead Powerlines

Rigging Near Overhead Powerlines

Crane operation near overhead power lines is one of the most dangerous jobs a rigging crew can undertake. In fact, electrocution is the number one cause of crane-related fatalities, making compliance with OSHA standards and guidelines absolutely crucial when working in close proximity to overhead power lines.

Before equipment is brought to a jobsite near overhead power lines, a 360-degree hazard assessment inside the work zone must be completed. If it is determined that a crane could exceed minimum required distances, further action is required by the contractor. The first option is to coordinate with the power company to have the lines de-energized and visibly grounded. Line owners will sometimes opt to move the lines so that minimum clearance distance can be achieved. Both options require some preplanning as it may take some time to complete the necessary work.

OSHA requirements for working near overhead power lines that are not de-energized are clear cut. For power lines 50 kV or less, all parts of the crane, boom, rigging equipment, and loads carried must be kept at least 10 ft. away. This distance increases to 20 ft. for lines rated 50 kV to 350 kV, and 50 ft. for lines over 350 kV. If the voltage cannot be determined, cranes and rigging equipment must be kept at least 45 ft. away. A planning meeting with the crane operator and riggers must be conducted to review the location of the power lines and implement a rigging plan to prevent encroachment. All tag lines used must be non-conductive to prevent electrocution. An elevated warning line, barricade or line of electrocution hazard warning signs equipped with high-visibility flags must be erected 20 ft. from the power line in view of the crane operator. In addition, the rigging contractor must utilize at least one of the following: a dedicated spotter, proximity alarm, range control device, range of motion limiting device, and/or insulating link.

Crane operators and rigging crew members should be trained to work safely near overhead power lines and how to react if safety measures fail and contact is made. Dedicated spotters have the important responsibility to ensure that the minimum distance is not breach and thus must receive special training.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://www.rbaker.com

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...