All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

R. Baker & Son Comprehensive Equipment Management Strategy

demolition equipment at JFK NYC

Demolition projects demand specialized equipment, machines, and tools to ensure safe and efficient execution. At R. Baker & Son, we employ an array of assets, including excavators, cranes, flatbed trucks, Lulls, forklifts, cutting torches, concrete saws, and more, to tackle each project's unique challenges. Keeping track of this extensive inventory, monitoring their locations, conditions, and preventive maintenance requirements, is a large and complicated task. 

To manage these assets, we utilize sophisticated software that meticulously tracks asset inventory, job locations, preventive maintenance schedules, repair statuses, parts requirements, and warranty information. 

Our success extends beyond meticulous record-keeping and up-to-date inventory management. Our repair shop and on-site operators are the driving force behind the efficiency of our demolition projects. We implement various procedures to maintain optimal performance:

1. Well-trained heavy equipment mechanics: Our mechanics diligently perform preventive maintenance in our shop and make emergency field repair visits when necessary.

2. Operator training: Proper training for field operators is paramount at R. Baker & Son. We ensure that all equipment operators understand how to use the machinery correctly, carry out basic maintenance tasks, identify anomalies, and report issues promptly.

3. Safety checks: Before each use, we conduct thorough safety checks, including verifying alarms, lights, emergency stop functions, and control operations.

4. Regular inspections: We regularly inspect equipment for worn, damaged, or malfunctioning parts and call for field service from our mobile equipment mechanics when required.

5. Post-use cleaning: After each use, we thoroughly clean the equipment to remove dirt, dust, and other demolition materials that could obstruct proper functionality.

6. Lubrication: We provide on-site lubrication for moving parts to reduce friction and prevent premature wear and tear.

8. Manufacturer recommendations: We adhere to the equipment manufacturers’ recommendations for regular maintenance, as this not only extends the equipment's lifespan but also ensures worker safety and increases productivity by reducing downtime.

9. Equipment check-in: Upon its return to the shop, each piece of equipment undergoes a detailed checklist and is tagged with its status for immediate visual inspection.

By implementing these procedures, we ensure that our demolition equipment operates at peak performance, maximizing project efficiency while prioritizing worker safety.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Minority and Women-Owned Business Enterprise (M/WBE), in business since 1935, is a premier specialized contractor operating in the United States, Canada, and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in six sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities of over $20 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://www.rbaker.com/

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...
Industrial building demolition with advanced machinery by R. Baker & Son
R. Baker & Son: Experts in Modern Demolition Technology

Building demolition technology has undergone remarkable transformations over the decades, reflecting advancements in engineering, safety standards, and environmental stewardship. The evolution from...
Ground Penetrating Radar (GPR) - Demolition Contractor R. Baker & Son
Ground Penetrating Radar - Must have tool in Concrete Cutting and Demolition

At R Baker we have been involved with many demolition projects each one having its own set of challenges. When cutting concrete in an active facility or performing select or partial demolition you...
R. Baker & Son riggers installing 24 pharmaceutical bioreactors with platforms and safety railings in upstate New York facility
How We Installed 24 Bioreactors in Just 4 Weeks (NY Pharma)

R. Baker & Son recently completed a complex pharmaceutical equipment installation project after receiving a referral from a senior process engineer at a leading New Jersey design firm. The...
Professional Rigging Services: Expert Equipment Handling and Installation to Avoid Costly Damage
Professional Rigging: Why Equipment Installation Requires Expert Expertise

Comprehensive Rigging Services Across Industries R Baker & Son's rigging teams collaborate with equipment manufacturers across virtually every major industry. This extensive experience...