Utility Safety During Demolition

Utility Safety During Demolition

Demolition in New Jersey requires considerable planning when it comes to utilities. Before R. Baker & Son begins a project, multiple above-ground and below-ground utilities must be considered and identified, and may need to be shut off, disconnected, and/or relocated in order to perform demolition.

Prior to starting demolition, each utility company must be contacted. Local representatives or field engineers will be assigned to the project and may require submission of drawings, applications, and/or permits pertaining to the individual utilities. For example, electrical lines will need to be shut down, relocated, tested, and reenergized under the supervision of the electric company, who may also need to notify nearby customers of power interruptions. Similarly, water lines may require that valves be shut down and verified that they hold, and pressure taken off the line and locked out for worker safety. Gas lines may need to be shut down, pressure relieved and purged of all residual gas, and verified before work can commence.

Fiber optic cables and cable TV also require coordination with the utility companies. Fiber optic cables carry significant amount of data, and a severed line can affect service to thousands of commercial and residential customers. Damage to TV cables can cause outages for numerous customers as well.

Utility representatives will mark where underground utilities are located with paint and flags to prevent accidents and unnecessary interruptions. The most common method for locating utilities is using a tick tracer or sensitive metal detectors to locate piping or electrical lines.

Though drawings and as-builts are valuable aids in locating utilities, it should be noted that there may be inaccuracies, and sometimes these drawings have been misplaced and can’t be located. Also, easements that give utilities a right of way to exist are often unmarked, and as NJ is the most densely populated state, there is an increased chance of accidental damage to utilities.

Lastly, when removing utilities during demolition, it is important to preserve all meters and return them to the utility company. For more information on utilities during demolition, please contact R. Baker & Son at 732-222-3553.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Small Business (SDVOSB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook:  https://www.facebook.com/Demolition.Rigging

Full News Archive

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

The finishing beam used in the process weighed 2,600 lbs and had to be perfectly parallel and level to the drum it was refinishing, both within less than 1/64 of an inch.
Industrial Drum Refinishing Support: A Custom Rigging and Structural Solution

When a manufacturer we had previously performed rigging assembly and installation work for returned more than a year later with a unique and complex challenge, they knew who to call. The company...
Air skates (air casters) lifting and moving multi-ton industrial equipment using compressed air in a plant relocation project
Air Skates: How to Move Multi Ton Loads Without Touching the Floor

Air skates, also known as air casters, air skids, or air dollies, are a specialized rigging solution that R. Baker & Son has deployed for many years to move heavy machinery, fragile equipment,...
demolition innovation in protection - substation, non metallic wire mesh,
Demolition Protection: Safeguarding People, Property & Critical Systems

What Demolition Protection Truly EntailsIn the complex world of demolition, protection goes far beyond basic safeguards. As therecognized leader in demolition protection, R. Baker & Son defines...
R. Baker & Son rigging crew performing pre-construction planning and heavy equipment rigging for demolition and industrial plant relocation project
Precon Services for Demolition, Rigging & Plant Relocation

For more than 90 years, R. Baker & Son has been delivering expert precon services for demolition, rigging, and industrial plant relocation projects. Before any construction work begins, our team...
Rigger working on R. Baker & Son - All Industrial Services. Welding.
Rigging, Assembly and BIM: Bridging the Gap

Prefabricated equipment and systems have become the standard for good reason. The more you can prefabricate, the faster, more cost-effective, and higher quality a project becomes. The goal is simple:...
Several large steam-to-hot-water heat exchangers
Quick Mobilization for Pilot Plant Dismantling and Demolition

When a building consolidation commitment required our client to dismantle and demolish a 30,000 square-foot pilot plant immediately, they turned to R. Baker & Son. Having rigged much of the...
Rigging, completely assembling, and setting 12 large fiberglass cylindrical tanks, each with a 17,000-gallon capacity.
Rising to a Rigging Challenge: Tank Installation in N. Philadelphia

The Project Scope As part of a major rigging project in North Philadelphia, R. Baker & Son faced a complex installation challenge: rigging, completely assembling, and setting 12 large...
Nine downflow booths carefully dismantled and packaged for refurbishment during pharmaceutical lab renovation.
Negative Pressure Demolition in an Active Pharmaceutical R&D Laboratory

R. Baker & Son had the unique opportunity to return to a pharmaceutical R&D laboratory project we had successfully completed years earlier, where our riggers and millwrights originally...